Lucy Craft Laney at Cleveland Park Community School is scheduled to undergo a renovation and starting as outlined below. To received periodic updates on project milestones and other news please sign up to receive e-alerts.

School Location: 3333 Penn Ave. N., Minneapolis, MN 55412

Scope of Work:

Enhance student safety through redesign of the main building entrance. Renovate existing front office into an additional conference room. Replace PA system throughout.  All lighting on first level, gym, cafeteria and media center will be replaced with energy efficient lighting and controls.

Project Updates: 

August 13,2020: Front entry, new monument sign, and lighting replacement on first level, cafeteria, gyms, and media center are substantially complete.  Furniture for the new entry and conference are scheduled for install in early fall.  Remaining electronic coordination for the front entry security and monument sign to be completed by end of August. 

June 25, 2020: Demolition is complete and new walls in the entrance and conference room are framed. Old monument sign has been taken down and the excavation for the new sign is complete. Lighting replacement on first level is over 50% complete. 

May 5, 2020: Construction work started with demolition of existing computer lab which will become the new safe and welcoming entrance. 

January 16, 2020: Contractor selected and awarded to Sheehy Construction. Work to begin summer 2020.

December 11, 2019: Design is completed and work on Construction Documents are wrapping up.  Project is scheduled to go out to bid mid-December.

Project Schedule (subject to change):

Design Contract Approval: July 18, 2019
Design: Summer-Winter 2019
Procurement: Winter 2019/2020
Pre-Construction: Spring 2020
Construction:  Spring- Summer 2020
General Contractor: Sheehy Construction Company
Completion: August 2020
 

 

Schematic Design Showing New Entrance Location in Former Computer Lab Space
Schematic Design Showing New Design of Enhanced Safe and Welcoming Main Entrance
New Conference Room
New Conference Room
New Safe and Welcoming Entrance
New Safe and Welcoming Entrance
Classroom with new LED fixtures and dimmable controls 6/16/2020
Classroom with new LED fixtures and dimmable controls 6/16/2020
View of new safe and welcoming entrance office 06/30/2020
View of new safe and welcoming entrance office 06/30/2020
New monument sign before precast cap installation 08/11/2020
New monument sign before precast cap installation 08/11/2020